| Board Letter | | | Information on the Antelope Valley - East Kern Water Agency High Desert Water Bank Program | MWD/Board of Directors | | 9-2 | Board of Directors^Water Planning and Stewardship Committee | | 2018 | 9/11/2018 | 09-Sept |
| Board Letter | | | Adopt CEQA determination, approve the job description for the Ethics Officer and approve the hiring process for the Ethics Officer | MWD/Board of Directors | | 8-5 | Audit and Ethics Committee^Board of Directors | | 2018 | 9/11/2018 | 09-Sept |
| Board Letter | | | Adopt CEQA determination and award $420,000 contract to Southern Contracting Company for replacement of 15 kV circuit breakers at Hiram W. Wadsworth Pumping Plant | MWD/Board of Directors | | 7-4 | Board of Directors^Engineering and Operations Committee | | 2018 | 9/11/2018 | 09-Sept |
| Board Letter | | | Adopt CEQA determination and authorize increase for contract for legal services with Hanson Bridgett LLP to provide legal tax and benefits advice on deferred compensation plans, other employee benefits, and CalPERS matters | MWD/Board of Directors | | 7-6 | Board of Directors^Legal and Claims Committee | | 2018 | 9/11/2018 | 09-Sept |
| Board Letter | | | Adopt CEQA determination and authorize granting a lease amendment to the City of Los Alamitos, for a recreational city park referred to as Stansbury Park located in the City of Los Alamitos within Orange County | MWD/Board of Directors | | 7-8 | Board of Directors^Real Property and Asset Management Committee | | 2018 | 9/11/2018 | 09-Sept |
| Board Letter | | | Adopt CEQA determination and authorize granting a lease amendment to Greenland Farm, Inc., for agricultural purposes on Metropolitan fee-owned property in the City of Hemet, within the county of Riverside | MWD/Board of Directors | | 7-7 | Board of Directors^Real Property and Asset Management Committee | | 2018 | 9/11/2018 | 09-Sept |
| Board Letter | | | Adopt CEQA determination and appropriate $970,000; and award $556,000 contract to American Construction and Supply, Inc. to install cathodic protection on the Orange County Feeder | MWD/Board of Directors | | 7-3 | Board of Directors^Engineering and Operations Committee | | 2018 | 9/11/2018 | 09-Sept |
| Board Letter | | | Adopt CEQA determination and appropriate $970,000; and authorize preliminary investigations to remediate slopes at the Robert B. Diemer Water Treatment Plant; and agreement with GEI Consultants to provide geotechnical support | MWD/Board of Directors | | 7-1 | Board of Directors^Engineering and Operations Committee | | 2018 | 9/11/2018 | 09-Sept |
| Board Letter | | | Adopt CEQA determination and appropriate $870,000; and award $619,000 contract to Shipley Construction & Plumbing to renovate three houses at Iron Mountain Pumping Plant | MWD/Board of Directors | revised letter | 7-2 | Board of Directors^Engineering and Operations Committee | revised letter | 2018 | 9/11/2018 | 09-Sept |
| Board Letter | | | Adopt CEQA determination and appropriate $6.68 million; and authorize upgrades to three hydroelectric power plants (Appropriation No. 15458) | MWD/Board of Directors | | 8-1 | Board of Directors^Engineering and Operations Committee | | 2018 | 9/11/2018 | 09-Sept |
| Board Letter | | | Adopt CEQA determination and appropriate $2.78 million; and award $866,600 contract to J. F. Shea Construction, Inc. to replace service connection valves on the Rialto Pipeline (Appropriation No. 15480) | MWD/Board of Directors | | 8-2 | Board of Directors^Engineering and Operations Committee | | 2018 | 9/11/2018 | 09-Sept |
| Board Letter | | | Adopt CEQA determination and adopt resolution designating Metropolitan's maximum contribution for medical benefits in order to comply with the current authorized Memoranda of Understanding | MWD/Board of Directors | | 7-5 | Board of Directors^Organization, Personnel and Technology Committee | | 2018 | 9/11/2018 | 09-Sept |
| Board Letter | | | Adopt CEQA determination and adopt reporting structure for MetropolitanÆs Ethics Officer | MWD/Board of Directors | | 8-4 | Audit and Ethics Committee^Board of Directors | | 2018 | 9/11/2018 | 09-Sept |
| Board Letter | | | Adopt CEQA determination and adopt MetropolitanÆs Proposed Facilities Naming Policies and Procedures | MWD/Board of Directors | | 8-3 | Board of Directors | | 2018 | 9/11/2018 | 09-Sept |
| Board Letter | | | Adopt CEQA and authorize granting a permanent easement to the California Department of Transportation on Metropolitan property to facilitate widening State Route 62 across a siphon along the Colorado River Aqueduct within the County of Riverside | MWD/Board of Directors | | 7-9 | Board of Directors^Real Property and Asset Management Committee | | 2018 | 9/11/2018 | 09-Sept |