Comment
  
  
Additional Comments
  
  
  
Board Letter064864670.pdf
  
Report on status of outside counsel's review of the policies and procedures of Metropolitan's Ethics Office; and authorize an increase in amount payable to contract for legal servicesMWD/Board of Directors
BOD agenda item 7-3Board of Directors
20181/9/201801-Jan
Board Letter064864672.pdf
  
Authorize preliminary design to rehabilitate, provide engineering design services, and environmental support for prestressed concrete cylinder pipe portions of the Allen-McColloch Pipeline, Calabasas Feeder, Rialto Pipeline, and Sepulveda FeederMWD/Board of Directors
E&O agenda item 8-1Board of Directors^Engineering and Operations Committee
20181/9/201801-Jan
Board Letter064864668.pdf
  
Adopt CEQA determination and award procurement contracts to furnish a waterjet cutting system and a hydraulic press brake for the La Verne Shops UpgradesMWD/Board of Directors
E&O agenda item 7-2Board of Directors^Engineering and Operations Committee
20181/9/201801-Jan
Board Letter064864674.pdf
  
Adopt CEQA determination and authorize design of seismic upgrades to three buildings at the La Verne siteMWD/Board of Directors
E&O agenda item 8-2Board of Directors^Engineering and Operations Committee
20181/9/201801-Jan
Board Letter064864676.pdf
  
Adopt CEQA determination and authorize design and construction to refurbish the generator at Valley View Hydroelectric Plant; and preliminary design to rehabilitate auxiliary systems at that facilityMWD/Board of Directors
E&O agenda item 8-3Board of Directors^Engineering and Operations Committee
20181/9/201801-Jan
Board Letter064864666.pdf
  
Adopt CEQA determination and appropriate $320,000; and authorize construction to replace the roofs on two buildings at the Eagle Rock Control CenterMWD/Board of Directors
E&O agenda item 7-1Board of Directors^Engineering and Operations Committee
20181/9/201801-Jan