Comment
  
  
Additional Comments
  
  
  
Board Letter064801142.pdf
  
Preliminary design, permitting, and right-of-way planning for access and pipeline protection improvements within western San Bernardino County, and preliminary investigations of similar improvements in Los Angeles, Riverside, and San DiegoMWD/Board of Directors
7-4Board of Directors^Engineering and Operations Committee
20137/9/2013
Board Letter064801146.pdf
  
Board approval of Metropolitan Water District of Southern California's Salary Schedule pursuant to CalPERS regulationsMWD/Board of Directors
7-6Board of Directors^Organization, Personnel and Technology Committee
20137/9/2013
Board Letter064801138.pdf
  
Authorize payment up to $571,056 for support of the Colorado River Board and the Colorado River Authority of California for fiscal year 2013/14MWD/Board of Directors
7-2Board of Directors^Water Planning and Stewardship Committee
20137/9/2013
Board Letter064801136.pdf
  
Authorize entering into a Local Resources Program agreement with city of Anaheim for the Anaheim Water Recycling Demonstration ProjectMWD/Board of Directors
7-1Board of Directors^Water Planning and Stewardship Committee
20137/9/2013
Board Letter064801148.pdf
  
Approve the selection of a third-party Other Post Employment Benefits (OPEB) trust provider; and authorize execution of an agreement(s) with the board-approved providerMWD/Board of Directors
8-1Board of Directors^Finance and Insurance Committee
20137/9/2013
Board Letter064801140.pdf
  
Appropriate $550,000; and authorize replacement of turbidimeters at the Robert A. Skinner Water Treatment Plant (Approp. 15485)MWD/Board of Directors
7-3Board of Directors^Engineering and Operations Committee
20137/9/2013
Board Letter064801150.pdf
  
Appropriate $4.53 million; and authorize final design and pipe fabrication for prestressed concrete cylinder pipe repairs on the Second Lower Feeder (Approp. 15471)MWD/Board of Directors
8-2Board of Directors^Engineering and Operations Committee
20137/9/2013
Board Letter064801152.pdf
  
Appropriate $4.2 million; and authorize final design of two electrical upgrade projects at the Joseph Jensen Water Treatment Plant (Approps. 15442 and 15371)MWD/Board of Directors
8-3Board of Directors^Engineering and Operations Committee
20137/9/2013
Board Letter064801154.pdf
  
Appropriate $2.7 million; award contract to L. H. Woods & Sons, Inc. for rehabilitation of the San Jacinto East Adit on the Colorado River Aqueduct; and authorize amendment to agreement with Jacobs Associates (Approp. 15373)MWD/Board of Directors
8-4Board of Directors^Engineering and Operations Committee
20137/9/2013
Board Letter064801156.pdf
  
Appropriate $1.5 million; and award $878,500 contract to Minako America Corp., dba Minco Construction to install cathodic protection on the Sepulveda Feeder (Approp. 15441)MWD/Board of Directors
revised letter
8-5Board of Directors^Engineering and Operations Committee
revised letter
20137/9/2013
Board Letter064801144.pdf
  
Appropriate $1.15 million and authorize final design of filter outlet conduit seismic upgrades at the Robert B. Diemer Water Treatment Plant; and amend agreement with URS CorporationMWD/Board of Directors
7-5Board of Directors^Engineering and Operations Committee
20137/9/2013